Matelec Group
To reduce operational costs and commit to green manufacturing, Matelec integrated a high-efficiency 3 MWp solar array with 2.4 MWh of battery storage into their production facility
The challenge
Matelec runs energy-intensive operations, especially during peak daylight hours. Frequent outages and rising tariffs were affecting both costs and production schedules. The client sought a dependable solar partner to stabilize and optimize their energy infrastructure.
Solution
We delivered a 3 MWp ground-mounted array on unused land adjacent to the facility. With seasonal tilt functionality and integrated smart inverters, the system was designed to adapt to local weather patterns and maximize output.

Services provided
We designed a tailored solar solution for Matelec, ensuring optimal energy efficiency and long-term savings.
✅ Energy usage audit & load profiling
✅ Ground-mount structural design & layout
✅ Seasonal tilt mounting system
✅ Smart inverter integration with factory automation
✅ Real-time monitoring and performance tracking













